The traditional local dry stone wall motif has been used as a template for the whole surfacing, and the small traditional stone hut, the so called kažun, an example of the archetypical structure has been used as the basic structural pattern. The sports hall solution plan has been made to meet the design and construction time schedule of 11 months, which was possible only by using RC prefabricated elements. All the bearing and façade elements of the sports hall have been made from prefabricated elements. Its integration into the environment has been achieved by minimizing its size, blending with the landscape but also by using local stone materials for façade surfacing which gives to this modern building the appearance of an traditional house.